We has over 20 years experience providing Conveyor Maintenance to a wide range of mining clients supplying labor equipment and materials.
We offer:
Belt Installation and splicing services
※Emergency breakdown callout service
※Scheduled maintenance
※Remote location service contacts
※Project installation
※Specialized change outs systems and produces for reduced down time
※Splicing innovation (having developed new spicing methods for greater life)
※Fully trained and nationally accredited Service staff
※Splicing Services cover all aspects of conveyor belting, include Multi-ply conveyor belt, Steel Cord, Solid Woven underground belts,etc.
Projects
Our Engineered Conveyor Solutions is able to offer a systematic approach to undertake all types of turnkey installations commissioning for surface and underground mine sites, ship loading, stockpiling & ore processing.
Technical Services
Always offering a range of services to assist with initial design and predictive maintenance such as:
※Conveyor Design
※Conveyor Belt mapping service
※Independent splicing QA
※Belt pull calculations to help ensure the safe and controlled installation of Conveyor Belting
※Conveyor Belt inspections with automatic reporting including a summary showing areas needing urgent attention
※Financial reporting on Whole Of Life cost and $/ton highlighting details of areas of high spend
※Non-destructive testing incorporating predictive Conveyor Belt life details to aid planning of Conveyor Belt change outs and maintenance budgeting

V Belt runs longer and perform better if they are given the proper care and attention during installation.
Proper care as below:
※Check pulleys and make them aligned. Incorrect alignment may shorten the service belt life.
※Check the pulley main components and lubricate the working parts periodically.
※Pay attention to the pulley grooves and make sure they are all equal in dimensions.
※Check the pulley abrasion and remove any rust, dirt or grease that may influence belt usage.
※Ensure heat dissemination of pulley in belt operation.
V belt installation as follows:
※Locate belt by moving the motor
※Put belts onto the pulley one by one and locate belts first on the driving pulley
※Do not use a lever to force belt onto pulleys but turning pulley slowly can facilitate installation.
※Apply tension to prevent slippage at full loading and run 5 minutes and re-tension. If necessary, please re-adjust the tension after belts running a few days.
※Do not combine to use new and used belts in one set that may shorten belt life due to unbalanced stretch of belts.